Desilting Coal Fines From Process Water Ponds

A total turnkey solution to desilt a process water dam at a coal mine in the Middelburg area of Mpumalanga province was all in a day’s work for pump solutions specialists Integrated Pump Rental. According to Integrated Pump Rental managing director Lee Vine, it is not uncommon for factors like high rainfall or an unexpected process fault to cause overfilling of a process dam with silt. In a recent case, a mining customer urgently needed a process dam that had become filled with coal fines to be emptied. The situation raised the risk of an environmental incident which could have potentially interrupted the smooth operation of the coal processing plant. “One of the specific issues with coal fines is that they settle very quickly and create a highly compact layer at the bottom of a pond. This makes it more difficult to create a slurry that can be pumped away,” says Vine. “The SlurryBlaster is our effective hydro mining solution for removing slurry and sediment accumulation on dam walls and inside dams, boasting a capacity of up to 2,800 litres per minute with a nominal inlet pressure of 7 bar.” In this case, the coal fines could be blasted into an accumulation point where a slurry pump was then used to transfer high tonnages of the sediment to a location specified by the customer. Integrated Pump Rental also provided the pipelines and fittings that the solution required. “As part of our project assessment, we ascertained that the slurry demonstrated a low pH level of just three,” he says. “This high acidity meant that we had to deploy our stainless steel range of pumps and equipment to ensure corrosion-resistance.” Vine highlights that the mine was able to take the dam off-line, and that water from another source was used to feed the mine’s process plant while the desilting process was underway. “To conduct the hydro-mining option on this project, we secured an external water source and used two monitoring guns to attack the silt – turning it into a slurry that we could then pump through our own pipeline to the tailings dam,” he says.

Comments

Popular posts from this blog

Mines to gain control of yellow metal assets – aims to reduce fraud

Reconditioning of components with Thermal Spray Coatings

Epiroc and Elf Drilling – keeping the finger on the mining pulse